Home >   Case Studies

Case Studies


Malaysia - 10/09/09
Record Shutdown Time in Malaysian Refinery due to Industrial Rope Access

Industrial Rope Access, carried out by SGS, led to a record shutdown time in Malaysian Refinery. Learn more about this favored new surveying approach explained on a recent inspection case in the Southeast Asian region.
Read More
Select Business:

Results 1 - 5 of 5
10/09/09 Industrial Record Shutdown Time in Malaysian Refinery due to Industrial Rope Access
Industrial Rope Access, carried out by SGS, led to a record shutdown time in Malaysian Refinery. Learn more about this favored new surveying approach explained on a recent inspection case in the Southeast Asian region.
10/09/09 Industrial SGS Inspects Storage Tanks in Jakarta Using Industrial Rope Access
SGS successfully conducted Periodic Tank Inspection in Jakarta using Industrial Rope Access. As some areas were difficult to reach, Industrial Rope Access was the ideal solution for the SGS team to successfully perform and complete the inspection project.
04/04/08 Industrial Positive Material Identification for Critical Piping Systems
SGS was challenged with performing retro Positive Material Identification for one of its’ long time refining clients to address the issue of non-conforming material components in critical piping systems.
31/03/08 Industrial SGS carries out Service Analyses after pipe explosion
After an explosion due to a piping related failure SGS Industrial was called in to help perform a suitability for service analysis of the subject facility located in England
31/03/08 Industrial Recommendation Tracking System for an Inspection Project
SGS Industrial Services began a large baseline implementation on inspection project with a client in 2004. During the course of working the inspection project SGS recognized the need for a system that would process the identified recommendations more efficiently and effectively.